TOOSAB CONSULTING
 

Dams & Power Plants

 

The main fields of activities of dams and water resources department consist of three sections as below:  

1. Water resources plans  

2. Dams and hydropower plants  

3. River engineering  

4. Application of GIS and S un water resources management, structure and geotechnical.  

Currently this department is carrying out many projects and has employed 84 colleagues with the following academic qualifications:

PhD 2

Postgraduate 22

Bachelor of Engineering 30

Technicians 30

There are 4 divisions available in this department:

- Projects management section

- Dams and power plants section

- Water resources section

- Geotechnical section

 
 
Projects Name ordered by  

 Doosti reservoir dam

Republic of Turkmenistan - Ministry of water & land reclamation -Islamic republic of Iran - Razavi Khorasan regional water authority D

 Shirin-Darreh reservoir dam

Khorassan regional water authority D

 Sungun copper factory`s water supply, pumping installations and tailings disposal and transfer

Iranian mines and mineral industries development and reconstruction organization. National Iranian Copper Industries Company D

 Talar & Kassilian Reservoir dam

Mazandaran & Golestan regional water authority A

 Javark-e-bayza reservoir dom

fars regional water outhority-shiraz A

 Khairabad III dam and power plant

Khouzistan Water & Power Organization A

 Ghordanloo reservoir Dam

North Khorasan Regional Water Authority A

 esfarayen reservoir dam

nort Khorasan regional water authority D

 Komayestan gravity dam & water transfer tunnel

Khorasan regional water authority D

 Daroongar reservoir dam

Khorasan regional water authority C

 Shahid Ya'Ghoobi Earth-fill dam

Khorasan regional water authority D

 Pirtaghi Dam and power plant

Iranian Water resources and power development company B

 Studies of stability control of concret arch dams of torogh, kardeh and barzoo

khorasan razavi regional water authority A

 Khorasan pumped- storage power plants

Iranian water resources and power development company B

 Upgrading studies of integrated water plan in East of Iran

ministry of Energys water mega planning and water and wastewater office B

 Integrated water resources management of Kabul river basin

iran, Regional center on urban water management Tehran... - A

 Geotechnical tests of Gambiri plain irrigation network - Afghanistan

ministry of water and energy of Afghanistan C

 Geotechnical tests of water pumping installations from AmuDarya River to Andkhoi region - Afghanistan

ministry of water and energy of Afghanistan C

 Zahidan water treatment plants field laboratory

sistan & Baluchistan regional water authority C

 Tests on EIA for replacement of treated waste water with agricultural water in mashhad plin

razavi khorasan regional water authority C
 
Guide line
Study ended A
Under study B
Under construction C
Under operation D
 
 
 
                                     

Copyright © 2011 by TOOSSAB Engineering Consulting Co. Ltd., - All rights reserved